Summers Disk-Chisel Manuale Utente Pagina 72

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 71
3-6
SECTION 3 – OPERATION
FIELD OPERATION
1. Rephase cylinders before starting eld operation.
2. Choose a at spot in a eld to set tillage depth and level machine.
3. Determine desired tillage depth by working test strips within the eld.
IMPORTANT!
The operator is responsible for adjusting machine since machine does not come “Field
Ready” from factory.
NOTE: Optimum performance of machine is achieved by tilling at a depth and moving at a
speed that does not go beyond limit of trip assemblies. This limit is exceeded if connecting
bolt (shown in the following drawing) continually rides above trip assembly cap.
Vedere la pagina 71
1 2 ... 67 68 69 70 71 72 73 74 75 76 77 ... 118 119

Commenti su questo manuale

Nessun commento